Lot with mobile home moved - house site is middle right . It looks a bit different due to loss of several trees from drought and Hurricane Rita and lack of regular maintenance for the past year.

Home site prior to start of construction. Several large pines and a mound of tailings from the former Fuller's earth mine were removed from the area in th center of the photo just beyond the small oak.

The slab foundation is framed and piers drilled

The steel is added to the slab foundation form (from west end)

The foundation is recently poured (from lake side)

The framing begins (from lake side)

First floor framing almost complete

The second floor framing begins

 

Framing almost complete

View from balcony

View from lagoon

Windows and doors installed and upper level painted

Roofing with unpainted galvanized metal begins

The roof is now complete except for a fiew pieces on the front porch. This view is from the llake side of the house.

Except for the wooden porch, the exterior is pretty much done with painting and stonework now completed.